Supplier certificate management for food manufacturers
A wrong batch that reaches production can cost you a recall. The system follows each batch from the label back to the supplier's certificate and shows you where something does not add up.
Example the system follows a label back to the supplier's certificate
- LabelEgg tagliatelle · 250 g
Allergens: gluten, eggsMissing: soya
- The batch code is printed on the packBatchP-2410-31 · made on 14 October
Valdera Pasta · 2,400 packs
- The ingredients used in that batchProduction recordTagliatelle recipe
Semolina lot L-2409-52 · eggs lot L-2410-08
- The supplier's certificate, matched to the lotCertificateSan Rocco Mill · analysis no. 8812
Semolina L-2409-52. Allergens: gluten. May contain traces of soya (shared milling line)
Example, for a made-up company and batch.
Where a batch turns into a problem
Deliveries
TodayDelivery notes and certificates come in every format and get checked by hand, when there is time.
With the systemEach document is read and matched to the right lot. Anything missing, or not matching the order, is held.
Lab results
TodayThe lab's test report is a PDF: values are compared with the limits by eye.
With the systemEvery value sits beside its limit. If one is out, the batch waits for your decision.
Labels
TodayAllergens and values on the label are rechecked against the recipe only when someone remembers.
With the systemThe label is checked against recipe and certificates: differences show before printing.
Records and deadlines
TodayFood safety records, calibrations and training: a gap turns up on the day of the audit.
With the systemEmpty boxes and out-of-limit temperatures are highlighted. Every deadline has its date and its reminder.
Recall
TodayWhen a batch comes under suspicion, working out where it went takes days across warehouse, production and dispatch.
With the systemEvery incoming lot stays linked to the batches made and the deliveries: from certificate to customer in one search.
How we work
- 01
Measure
We listen to the people who do the work, on your real documents.
- 02
Design
The system in modules, highest value first.
- 03
Build
One module at a time, checked. Then we stay with it.