Industries · Steel fabrication

Software for steel fabrication

A drawing lists steels, welds and inspections. The system checks them against your certificates and your welding procedures, and tells you what is covered and what is missing.

Example the system lights up the welds on a drawing

Alfa ContractorsDrawing ST-14 · rev. B

Bracket welds

G1 · Base plate, 8 mm, flat
Procedure 03 · welder 0412
G2 · Gusset to column, 10 mm
Procedure 04 · welder 0298
G3 · Beam to column, 20 mm, vertical-up
Procedure 05 is only tested flat
G4 · Gusset under the beam, 10 mm
Procedure 04 · welder 0298
G5 · End plate, 12 mm
Procedure 03 · welder 0412
Four welds out of five are covered. G3 needs a vertical-up weld test: you decide whether to take the job.

Example, for a made-up company and job.

From order to dispatch

Where a job gets stuck

Order confirmed

TodayWhich welding procedures are already qualified? Someone has to check by hand.

With the systemThe system checks every procedure against your qualifications: what is covered, what is missing.

Cutting and preparation

TodayOnce the plate is cut, the link to its mill certificate is lost.

With the systemPlates and sections stay traced from heat number to part, certificate attached.

Welding and assembly

TodayWhich procedure holds on which thickness? Often only one person knows.

With the systemAsk the standard and your own procedures: every answer cites the passage it comes from.

Inspection and treatment

TodayTest reports arrive scattered, and the inspector is the one who finds the untested joint.

With the systemEach report is matched to its joint, so you spot the one with no test before anyone else does.

Dispatch and data book

TodayWhen the job ends, the data book is rebuilt by hand, retyping the same data.

With the systemOne archive in one place, and the data book is composed on your own templates.

How we work

  1. 01

    Measure

    We listen to the people who do the work, on your real documents.

  2. 02

    Design

    The system in modules, highest value first.

  3. 03

    Build

    One module at a time, checked. Then we stay with it.

Tell us the problem
in two lines.

Let's talkWe reply by hand. Or write to [email protected]
References: ISO 15614 · ISO 9606 · EN 1090