Traced welds for shipyards and rail builders

A specification is dozens of pages of requirements. The system reads them, checks them against your yard's procedures and welders and tells you, joint by joint, what is covered and what is missing.

Example the system sets the welders' certificates on the block calendar

Alfa YardCoach frame · weeks 40-49

Blocks and welder certificates

Week
40414243444546474849
Block 1
Welder 0412
Block 2
Welder 0298
Block 3
Welder 0377
expires wk 46
BlockValid certificate
Welder 0377's certificate expires three weeks before block 3 ends: renew it or give the work to someone else. The rest is covered. You decide.

Example, for a made-up yard and job.

From specification to inspection

Where a job ends up waiting

Specification

TodayThe specification runs to a hundred pages, and two people know its exceptions.

With the systemThe system pulls out the welding requirements, each with the paragraph it comes from.

Procedures and qualifications

TodayProcedure and welder must both be qualified for that joint, and you rebuild the table by hand.

With the systemRequirements, procedures and welders on file: the joint-by-joint table is already there.

Blocks and contractors

TodayDozens of outside firms, each with its own hours and paperwork: you count at month end.

With the systemEach firm has its own file, complete before it starts; hours and progress every day.

Inspection

TodayThe joint with no cover is found by the inspector.

With the systemYou know what is ready, what expires and what is missing before the inspector arrives.

How we work

  1. 01

    Measure

    We listen to the people who do the work, on your real documents.

  2. 02

    Design

    The system in modules, highest value first.

  3. 03

    Build

    One module at a time, checked. Then we stay with it.

Tell us the problem
in two lines.

Let's talkWe reply by hand. Or write to [email protected]
References: EN 15085 · ISO 5817